Case Study on Product Data Management

Purpose

Requirements, purpose and end use of this task

Vault or team center clean up task is one of the process in data migration to any PDM application. The complete process of data migration involves initially data dumping stage. After the data is dumped to the server location provided for the Team Center or vault server there are tends to be following issues that needs to be addressed, namely:
Correcting all the above issues requires a detailed vault or team center clean up process. The end use of this task would be a vault or Team center devoid of duplicates and wrongly linked files.

Inputs required & volume of work

Inputs required

For TeamCenter clean up task, one would require the following data and authorities:

Volume of work in hand and the team size

This task involved more than 12,000 files and about 18,000 linked assembly and drawing files.It was a three member team assigned to the task.

Process required

The process of clean up involved:

Challenges and the ideas used

Challenge faced

The challenge was to correct files which had more than 1000 configurations at one go. Interlinked files which had inter-dependant with duplicate files.

Solutions, tips and new teamcenter options

For the challenges we discovered specific search criterions, so that we could process the multiple files in one go. We had utilized various new methods to streamline the search items in team center. These were some of the new discoveries while using teamcenter, but were not taught during the Teamcenter training.

Teamcenter issues:

Customer comments, results & rating

Customer comments

As of today. there have been 11.805 obsoleted parts And another 678 were made unavailable to users with just the DoNotUse_’. This is fantastic!
I have not had a chance to look up how many good files were corrected by you and the other guys. but there were 10.478 files that you guys fixed from the body plant clean-up efforts alone

Results:

Some of the Bridge Detailing Services we offer are:

The task was completed early than excepted and the team was allotted with new tasks and challenges. During this process we had to deal with 27 critical parts an assemblies which had immediate links with production ready assemblies and master assemblies. All the errors and discrepancies were handled with care and observation to detail.

The customer rated us 4.57 out of 5.00 for the aspects of JOB KNOWLEDGE, PRODUCTIVITY, QUALITY, TEAMWORK, DEPENDABILITY, COMMUNICATION & POTENTIAL

If there are multiple items with same name Teamcenter tends to link the assemblies and drawing with wrong or duplicate parts.